Digitization budget calculator
Turn an item count and a few measured minutes into hours and a labor cost for each stage of a digitization project.
Calculator
Most of the cost of digitizing a collection is people’s time: getting items ready, capturing them, checking the images, correcting the text and writing catalog records. The calculator above adds those times up for a collection of any size and multiplies them by an hourly rate, so you can see which stage drives the total before you ask anyone for a quote.
What the calculator computes
It returns the number of images to capture, the hours for each of five stages, the total labor hours, the labor cost at your rate, and the cost per image and per item.
Some stages happen once per item and some once per image. A letter with an envelope is prepared and cataloged once but captured three times, so the calculator keeps the two counts apart.
- Images = items × images per item.
- Preparation = items × preparation minutes ÷ 60.
- Capture = images × capture seconds ÷ 3,600.
- Quality control = capture hours × your quality control share.
- Text review and correction = images × review minutes ÷ 60.
- Cataloging = items × cataloging minutes ÷ 60.
- Labor cost = total hours × loaded labor rate. Cost per image and cost per item divide that cost by the image and item counts.
Getting good inputs
- Count items the way you will catalog them. If a folder will get one record, the folder is the item, and its images per item rise accordingly. The collection inventory worksheet gives you the counts by box and folder.
- Count every image. Include envelopes, the backs of photographs that carry writing or stamps, and blank pages if your policy says to capture them.
- Time real work. Take 20 or 30 typical items, including a few awkward ones, and time each step. Use the average, not the best run. Capture time per image should include placing, checking and naming, not only the moment of exposure.
- Text review depends on the material. Enter 0 for photographs without text. For typed and handwritten pages, the OCR accuracy calculator estimates correction time from a measured error rate.
- Use a loaded rate. That means wages plus payroll taxes and benefits. For volunteer projects, enter 0 to see hours only, or ask your funder how it values volunteer time.
- Split unlike material. Loose letters, a bound ledger and a drawer of glass plates move at very different speeds. Run each series separately and add the results.
Reading the results
Look first at which stage is largest. That is where better methods, or better estimates, change the total most. Cost per image and cost per item help when you compare options, but remember that a quote covers more than labor.
The stage rows are rounded to one decimal place, while the total is calculated before rounding. The rows can therefore add up to a tenth of an hour more or less than the total shown.
Limits
- It counts labor only. Equipment, storage, shipping, conservation treatment and overhead are excluded, and the result is not a Dastok quote.
- Averages hide spread. One fragile volume can take as long as a box of letters.
- Project management, rights review and the cost of keeping files over time are not included. The storage calculator covers the last of these.
- It gives hours, not calendar time. The project timeline calculator turns a capture rate into weeks.
Worked example
Example (fictional). After planning Box 3, the Aster County Historical Society wants to size the rest of the Okerlund family papers: 500 items, averaging 4 images each. Volunteers timed a sample and found 1.5 minutes to prepare an item, 45 seconds to capture an image, quality control at 15 percent of capture time, half a minute of text review per image and 6 minutes to catalog an item. The society uses a loaded rate of $38 per hour.
| Stage | Arithmetic | Hours |
|---|---|---|
| Preparation | 500 × 1.5 min | 12.5 |
| Capture | 2,000 images × 45 s | 25.0 |
| Quality control | 15% of 25.0 | 3.8 |
| Text review and correction | 2,000 × 0.5 min | 16.7 |
| Cataloging and metadata | 500 × 6 min | 50.0 |
| Total labor | 107.9 |
At $38 per hour the labor comes to $4,101, which is $2.05 per image and $8.20 per item. Cataloging takes almost half the hours, so the society decides to try AI-assisted cataloging on its pilot box before it fixes the budget.
From estimate to plan
Measured times beat guesses. A collection assessment or a pilot box puts real items through each stage, so the minutes you enter here come from your own material. If the estimate is headed for a grant application, carry the lines into the grant budget worksheet. As checked in November 2026, NEH’s Collections Stewardship program lists digitizing collections and making them available for public use among its eligible activities; read each funder’s current guidelines for what it will pay for. The Reading Room’s planning and funding section has more on budgets and funders.
Send one box first.
A pilot box shows you the images, the recognized text and the catalog records before you commit a whole collection. Tell us what is in the box and what you want people to find.
Studio and contacts
24 South Weber Street, Suite 225Colorado Springs, CO 80903(719) 244-8450sales@dastok.com